Modelling storage operation for markets participation and supply of advanced system services – Discussion Paper

Summary

The growth of power generation from Non-Programmable Renewable Energy Sources (NPRES) is accompanied by a progressive decrease of the operating hours of large synchronous generators. This increases complexity and costs, for Transmission System Operators (TSOs), to keep power system operation reliable and secure, since power flows are affected by more variability and unpredictability and, at the same time, less resources are available for frequency and voltage regulation, system balancing support and congestion management.

Thanks to their fast response, flexible control and easy scalability, Battery Energy Storage Systems (BESS) can be part of the solution mix to face such issues, by contributing to the supply of Ancillary Services (AS), both in a stand-alone configuration and in support of NPRES plants and of conventional plants.

AS include traditional ones, originally tailored to conventional power plants, and novel ones, which are gradually being introduced by TSOs to meet the new needs for prompt intervention against system perturbations.

However, services characterized by comparatively slow response times and small power gradients may require large energy contributions, which may be difficult to achieve with the BESS limited energy content, while fast services, despite requiring smaller energy contributions, are not widespread (they have been introduced mainly into isolated power systems) and still lack consolidated regulatory frameworks and remuneration mechanisms. Besides, BESS investment costs, although exhibiting a decreasing trend, are still rather high.

Therefore, techno-economic analyses are needed to understand with what performance (in meeting power exchange requests and in coping with cycling aging) and with what profitability, for their owner/Balancing Service Provider (BSP), BESS could provide single or multiple services together (to look for revenue stacking in case a single service is not enough to reach investment payback).

“Power” versus “energy” services: e.g., with reference to the Italian nomenclature,

  • primary and fast frequency regulation versus tertiary frequency regulation/balancing and NPRES imbalance reduction;
  • secondary frequency regulation is somewhat in-between.

Remuneration schemes:

  • payment for availability: remuneration for power made available (e.g., Italian pilot projects called Fast Reserve and UVAM – virtual eligible units including different kinds of technology; British Enhanced Frequency Response)
  • payment for activation: remuneration for energy actually exchanged (e.g., standard AS in Italy, pilot projects in Italy)
  • the two forms of payment can be present together (e.g., Italian pilot projects called Fast Reserve and UVAM).

To this purpose, a dynamic response model and a stochastic optimization procedure for BESS sizing and management have been employed in this work. According to the results obtained in the simulations (mainly based on the current Italian market rules and Grid Code specifications),

  • “power” services remunerated for activation may not be profitable enough for a BESS, due to the rather small energy exchanges involved (this happens, e.g., for the Italian standard primary frequency regulation). In that case, the presence of a remuneration for the power made available could be fundamental to determine the economic attractiveness of such services.
  • For “energy” services, payment for activation can be profitable, due to the rather large energy exchanges involved. The actual profitability is anyway also determined by the energy prices.
    • In the Italian Ancillary Service Market (ASM), e.g., upward/downward prices for secondary and for tertiary frequency regulation (and balancing) seem to be sufficiently high/low respectively, although further analyses of historical market results are needed, to understand the impact of bid acceptance uncertainty on BESS economic results and to inquire whether suitable bidding strategies could be put in place by BESS to become competitive on the ASM.
    • In other European countries, these services can benefit of remuneration both for availability and for activation: e.g., in Germany and in Switzerland, all the services except Frequency Containment Reserve (FCR, which has only an availability payment). In the presence of a double remuneration, higher revenues could of course be expected; however, the specific remuneration prices should be analysed, to understand whether acceptable return on investment could be obtained.

Looking at Europe, the European Commission “Study on energy storage – Contribution to the security of the electricity supply in Europe, Final Report”, March 2020, plus a questionnaire shared among the ISGAN partners show that BESS are undergoing a fast development process, especially in Continental Europe (CE) and in Great Britain (GB). In CE, this process is mainly fostered by the high level of interconnection and by the cooperation among countries for balancing service procurement: such cooperation has already led to an integration of the platforms for energy exchange and balancing service exchange. In GB, electricity markets are very mature and exhibit a high segmentation of AS, aiming at better adapting to power system’s needs, on the one hand, and at creating business opportunities for market operators, on the other hand.

BESS are already present in many European countries, both as large stationary devices and as small distributed ones (and also as electric vehicles). They are often allowed to participate in wholesale energy exchange (on day-ahead/intraday markets) and/or in AS supply (via trading in ASMs in particular). BESS usually provide FCR and automatic Frequency Restoration Reserve (aFRR), sometimes manual Frequency Restoration Reserve (mFRR) and Replacement Reserve (RR); at present, BESS installed power devoted to AS ranges from few MW to some tens of MW to some hundreds of MW; such BESS are managed by few operators, mainly BSPs.

In several European countries, rules for BESS participation in electricity markets are the same as the ones for conventional power plants. Besides, in some countries this participation is allowed only via pilot projects, although BESS can already be aggregated together and also with loads and distributed generators. Work is still needed to overcome barriers to BESS full deployment, e.g. in terms of service technical specifications and performance requirements, market eligibility requirements, remuneration schemes.

Privacy Overview

1.- What are cookies?

Cookies are text files that are stored on the visitor’s terminal that store and retrieve information about navigation. Section 3 of this policy indicates the specific use of cookies on this website.

If you want more information about cookies, please see the following links:

 

2.- How to accept, deny or revoke consent for the installation of cookies

The website has a consent manager that allows users to accept or reject the installation of cookies when accessing it.

You can also delete cookies using the browser settings options. These allow you to adjust privacy levels, such as denying all cookies or deleting saved ones. To modify these parameters, consult the manufacturer or review the following documentation: Google ChromeMicrosoft EdgeMozilla FirefoxSafariBraveOperaiOS-Safari, and Android-Chrome.

If you restrict or block some or all cookies from this website, some of the functionalities or services provided on the page may not be available.

 

3.- Types of cookies used on this website

  • Technical cookies: These allow the user to navigate through a website, platform or application and use the different options or services that exist on it, including those used by the editor to manage and operate the website and enable its functions and services, such as controlling traffic and data communication, identifying the session, accessing restricted access parts, remembering the elements that make up an order, carrying out the purchase process of an order, managing payment, controlling fraud linked to the security of the service, requesting registration or participation in an event, counting visits for software license billing purposes, using security elements during navigation, storing content for video or sound dissemination, enabling dynamic content (e.g., loading animation of text or image) or sharing content through social networks. Also included in this category, due to their technical nature, are cookies that allow the most efficient management of advertising spaces that the editor has included on a website, application or platform based on criteria such as edited content, without collecting information from users for other purposes, such as personalizing that advertising content or other content.
  • Analysis or measurement cookies: These allow the responsible party to track and analyse the behaviour of users of the websites to which they are linked, including quantifying the impacts of advertisements. The information collected through this type of cookie is used to measure the activity of websites, applications or platforms, to introduce improvements based on the analysis of the usage data made by users of the service.

 

4.- List of cookies on this website

The provider Cactus uses the cookie "phpsessid".

Purpose: Session identifier provided by the server. It allows the user to view the website and interact with it. It is strictly necessary for the proper functioning of the page.

 

The provider Cactus uses the cookie "cookie_notice_accepted".

Purpose: Stores the user's acceptance of the website's cookie policy.

 

Google Analytics uses the cookie "_ga".

Purpose: Anonymous information about users' browsing of the website is collected in order to obtain statistics on visits received.

Google Privacy Policy Google Analytics Opt-out Add-on

Some of the cookies used on this website belong to third parties, different from the responsible party with whom service provision contracts are formalized. You can consult the complete information about these third parties in the previous link, where in the cookie declaration, you can differentiate between own cookies, which correspond to those where the provider field matches the link to this website, and third-party cookies, which are those where the provider does not match the URL of this website.

We inform you that some of our cookie providers may transfer data to third countries. You can find out about transfers to third countries, if any, made by the third parties identified in this cookie policy in their corresponding policies, through each one's privacy policy, where they will indicate the transfers to third countries they make, if any.